Drilling – Building 002 Street area D floor 1
- Status
- Active
- Sequence number:
- AI-85-2026
- Category:
- General
- From:
- To:
- Affected airports:
- Stockholm Arlanda Airport
What is happening or what needs to be done?
This Airport Information replaces AI-168-2026
Conversion of an existing lift shaft and storage room into a new sprinkler centre (rooms 21121 and 21117B). Connection to drain in corridor 21201, Gate area D.
Drilling at night between 30 April and 1 May
Consequences? Who is particularly affected?
There will be high levels of noise. Disruption for passengers and ongoing operations.
Which area of the airport is affected?
Building 002 Gate area D, level 1
The work area is cordoned off as shown in the image.
The work area is cordoned off as shown in the image.
For further information
Construction manager Swedavia. Peter Eriksson. Phone: 070-388 56 57
CAM coordinator Swedavia. Charlotta Bengtsson. Phone: 010-109 13 06
CAM coordinator Swedavia. Christer Lindwall. Phone: 010-109 15 09
Contractor LIHAB. Filip Edman Alleklev. Phone: 073-986 04 27
CAM coordinator Swedavia. Charlotta Bengtsson. Phone: 010-109 13 06
CAM coordinator Swedavia. Christer Lindwall. Phone: 010-109 15 09
Contractor LIHAB. Filip Edman Alleklev. Phone: 073-986 04 27