Skip to content
Swedavia extranet, to the start page.
Byt språk till Svenska
  1. Wiring for control systems

Wiring for control systems

Status
Active
Sequence number:
AI-404-2026
Category:
General
Location:
Airside
From:
2026-10-05 07:00
To:
2026-10-23 16:00
Affected airports:
Stockholm Arlanda Airport

What is happening or what needs to be done?

Wiring between sprinkler control panel in Pier C level 1 to apparatus room 1439 in culvert 1461
OVR-2026-413

Consequences? Who is particularly affected?

Work is carried out along the culvert wall so that passing staff

Which area of the airport is affected?

  Terminal 4 B092 level 1

Aktuellt område för arbetet

For further information

Swedavia
Stefan Larsson Mob: 072-075 77 39

Entrepreneur
INIT
Johan Bjärbom, Mob:072 217 14 12

Published Thursday, October 1, 2026

Swedavia extranet, logotype.

Emergency

112

Police

114 14

Customs office

90 114

©Copyright 2026 Swedavia