Ground and installation work on P7
- Status
- Active
- Sequence number:
- AI-353-2026
- Category:
- General
- Location:
- Landside
- From:
- To:
- Affected airports:
- Malmö Airport
What is happening or what needs to be done?
Ground and installation work will be carried out on P7.
The work includes excavation, ducting, cabling and installation of camera poles.
Consequences? Who is particularly affected?
- Smaller parts of P7 can be temporarily blocked off.
- Entrance and exit to P7 will remain open as usual.
- There may be an impact on traffic flows for periods on the road between the parking lots P4 and P7 and the barrier towards the terminal.
Which area of the airport is affected?
The work is carried out on P7 Pick-up/Drop-off.
For further information
Magnus Eriksson
Phone: 010-1090067
E-mail: magnus.eriksson@swedavia.se