B506 Hole making + deliveries in Cargo Body/Culvert
- Status
- Active
- Sequence number:
- AI-380-2026
- Category:
- General
- Location:
- Airside
- From:
- To:
- Affected airports:
- Stockholm Arlanda Airport
What is happening or what needs to be done?
Work for a new grease trap room, holes and material transport will take place as pictured.
Consequences? Who is particularly affected?
General information, The transports come via the loading street down to the loading dock.
The work is linked to the Arn Grease Separator project.
Which area of the airport is affected?
Building 506, floor 1
For further information
Pelle Smeds 070 655 84 03
Swedavia: Patric Diop 07622451763
Published