  1. Geotechnical Investigations Landside

Geotechnical Investigations Landside

Status
Coming
Sequence number:
AI-389-2026
Category:
General
Location:
Landside
From:
2026-09-29 07:00
To:
2026-10-18 17:00
Affected airports:
Stockholm Arlanda Airport

What is happening or what needs to be done?

Project T5 PBI Mediaförsörjning will conduct geotechnical investigations on landside. A number of groundwater monitoring pipes will also be installed during the process. The geotechnical survey involves 22 locations and will be carried out using a drill rig.

Consequences? Who is particularly affected?

Most of the locations are situated in areas away from the road network, parking lots, and walkways; therefore, there should be no significant impact, other than temporary effects during entry to and exit from the affected areas.

Which area of the airport is affected?

The area is located adjacent to Tulldammen and the customs/police building. The area is located south of Building 971, as well as on the gravel area south of P96.

Översiktsbild över provtagningsområde

For further information

Nils Lindahl Swedavia 0708450421

Christoffer Agn Swedavia 0761192105

Maria Lundberg Sweco +46709483290

Published Friday, September 25, 2026