  1. Electric power cable rerouting for apron 35 Terminal 4

Electric power cable rerouting for apron 35 Terminal 4

Sequence number:
AI-350-2026
Category:
General
Location:
Airside
From:
2026-09-15 09:00
To:
2026-09-15 13:00
Affected airports:
Stockholm Arlanda Airport

What is happening or what needs to be done?

The electric power cable feeding apron 35 will be moved to a new point in the switchgear.

Consequences? Who is particularly affected?

This means that the electrical distribution panel feeding apron 35 will be without power between 9 a.m. and 1 p.m.

Which area of the airport is affected?

Apron 35 Terminal 4.

Bild på var uppställningsplats 35 är (gul markering i bilden)

For further information

Project Manager Swedavia, Tim Sidemark, tim.sidemark@swedavia.se , 0724 02 66 85
CAM coordinator: Christer Lindwall. Phone: 010-109 15 09
CAM coordinator: Sam Karlsson. Phone: 010-109 41 21