Electric power cable rerouting for chillers Terminal 4
- Status
- Coming
- Sequence number:
- AI-351-2026
- Category:
- General
- Location:
- Airside, Landside
- From:
- To:
- Affected airports:
- Stockholm Arlanda Airport
What is happening or what needs to be done?
Electric power cables for chillers in Terminal 4 will be moved to a new point in the switchgear.
Consequences? Who is particularly affected?
This means that the chillers will be without power between 10 p.m. and 01 a.m.
Which area of the airport is affected?
Terminal 4 and users of chillers there.
For further information
Project Manager Swedavia, Tim Sidemark, tim.sidemark@swedavia.se , 0724 02 66 85