  1. Interior sprinkler work Pier C

Interior sprinkler work Pier C

Status
Active
Sequence number:
AI-276-2026
Category:
General
Location:
Airside
From:
2026-08-20 06:30
To:
2026-09-11 17:00
Affected airports:
Stockholm Arlanda Airport

What is happening or what needs to be done?

Interior sprinkler work on floors 1 and 2 in Terminal 4, Pier C

Consequences? Who is particularly affected?

The premises in question where the work is carried out are empty, but there is a risk that noise from the work can be perceived in the adjacent premises.

Which area of the airport is affected?

Teminal 4, building B092, Pier C
The work includes internal sprinkler installations on floors 1 and 2 with routing through cloakrooms and shafts to the sprinkler central.

Arbetsområde plan 1 B092 -Sprinklercentral 1320

For further information

Contact Swedavia
Stefan Larsson
stefan.larsson@swedavia.se
072-075 77 39

André Lindström,
andre.lindstrom@swedavia.se
070-2914797

Contact contractor
Erika Gard
erika.gard@sveab.se
070-458 75 17

Published Monday, August 17, 2026