Excavation in the ground Stage 1 Pier A
- Status
- Coming
- Sequence number:
- AI-285-2026
- Category:
- General, Traffic
- Location:
- Airside
- From:
- To:
- Affected airports:
- Stockholm Arlanda Airport
What is happening or what needs to be done?
One lane is closed due to excavation in the ground/asphalt.
Wednesday the 26th to 28th of August there will be a flag guard in production.
see pictures of the TA plan below
Consequences? Who is particularly affected?
The road will be one-way with one lane between Gate E9-E3.
Which area of the airport is affected?
Ground floor Pier A / Street area E9-E3
For further information
Swedavia:
- Construction Manager, Peter Eriksson, 070-388 56 57
- BAS-U, Henrik Magnusson, 070-520 81 35
- CAM Coordinator, Christer Lindwall, 076-866 41 66. STO-2025-284
Contractor EAAB:
- Site Manager, Jonas Strand, 072-233 31 85
Published