What is happening or what needs to be done?

Repair of sheet metal facade and suspended ceiling above the inner ramp road between gates 17 to 20. The work is carried out during the day between 07:00 and 16:00.

Consequences? Who is particularly affected?

Limited accessibility on the Inner ramp road at the work area when one lane is blocked. If necessary, the barrier will be moved between lanes and gates. A lane is always open with a width of at least 3 metres.

Which area of the airport is affected?

Inner ramp road between gates 17 to 20.

For further information

Swedavia AB, Peter Gunnarsson, 010-1093541

K21 Entreprenad ROT AB, Gustav Borne, 0702-509432

Published Wednesday, June 10, 2026