Work on new substation Pier-A
- Status
- Active
- Sequence number:
- AI-92-2026
- Category:
- General
- From:
- To:
- Affected airports:
- Stockholm Arlanda Airport
What is happening or what needs to be done?
This Airport Information replaces AI-137-2026
Extension for a new substation at Pier A Gate area E tip ground level. Work involves excavation/demolition, concrete pouring and assembly of substation as well as piping/connections. Also sprinkler installation on top of the substation.
Consequences? Who is particularly affected?
SGH and Operational Operations
Which area of the airport is affected?
Pier A tip, see picture
For further information
Construction Manager Swedavia: Peter Eriksson 070-388 56 57
BAS-U Swedavia: Henrik Magnusson 070-520 81 35
CAM coordinator: Christer Lindwall 010-109 15 09
CAM case STO-2025-284