Preparatory earthworks and installation of a new fire hydrant
- Status
- Active
- Sequence number:
- AI-86-2026
- Category:
- General
- From:
- To:
- Affected airports:
- Stockholm Arlanda Airport
What is happening or what needs to be done?
This Airport Information replaces AI-151-2026
Installation and connection of new fire hydrant.
The work includes preparatory earthworks that include excavation, mass handling and preparation of subsoil as well as installation and connection of a new fire hydrant.
CAM case STO-2026-039
Consequences? Who is particularly affected?
In connection with the installation of a fire hydrant, a temporary shutdown of the existing water pipe to BÖP is required, which must be coordinated in time with the airport's fire department.
Which area of the airport is affected?
East of taxiway Y between runway 01L-19R and runway 08-26.
For further information
Swedavia's contact person for the work: Per Jakobsson, Facilities and Systems - Land and Water and Sewerage, per.jakobsson@swedavia.se, 010-109 40 32
Swedavia project: Monifar Abacioglu, Facilities and Systems - Project STO Construction, monifar.abacioglu@swedavia.se, 076-424 55 69
CAM coordinator: Sam Karlsson, Operational Operations - ARN Process planning and coordination, sam.karlsson@swedavia.se, 010-109 41 21